Ski Resort News
04/16/2018
A total of 5 million euros has been invested in the quality of the infrastructure at Nassfeld:
- More comfort through piste improvements and extensions: Carnia Downhill Run (Piste 80), Schnittlauchkofel and Bobo Trail (Piste 70)
- Newly built race & training piste "Rudnigsattel": training facility for ski clubs, bookable with prior registration
- Extension and optimisation of the mechanical artificial snowmaking facility / expansion of the water reservoir
- Expansion of the piste guidance system and the snow depth measuring system
- New beginners practicing area including rope lift and new ski school building directly at the lower terminus of the Millennium Express gondola lift as well as extension of the piste surface in the beginners area
- Extension and enhancement of the cross-country ski and biathlon centre in Tröpolach
- Quality investments in tourist accommodations and culinary establishments
Winter season 2018/19 from 07/12/2018 until 22/04/2019
Latest Resort News
The Grands Montets reconstruction in Chamonix
After a year of studies, fine-tuning, and preparatory work, the Mountain Planet 2024 Exhibition in Grenoble is the occasion for the Compagnie du Mont-Blanc and Doppelmayr France to bring together the stakeholders of the Chamonix Grands Montets reconstruction project and officially launch the construction phase of the various infrastructures.
04/18/2024
Vail Resorts to acquire Crans-Montana ski resort in Switzerland
US ski resort operator Vail Resorts is expanding its presence in Switzerland. Following Andermatt-Sedrun, the "big player" now also takes over the mountain railways in Crans-Montana.
02/10/2024
A new San Martino di Castrozza lift connection between Ces and Tognola
A new gondola in the heart of the skiarea San Martino di Castrozza Passo Rolle. The lift connection between Ces and Tognola area in San Martino di Castrozza has been improved.
03/25/2024